REE vs REN TSOs Grid Connection Permits – Portugal should study all of the Direct Agreements – Termos de Referência asap and implement the same process Termos de Referência for Wind Energy
The purpose of this document is to compare the Spanish and Portuguese TSOs (REE and REN) Grid Connection Permits grants, already studied and with Connection Costs issued, and Connection requests waiting for Studies and respective TRC (Titulo de Reserva de Capacidade) in PT and (Acceso y Conexion) in ES. Solar PV Spain has a Total…