Storage is now a first design assumption, not a bolt-on
Prosolia Energy just commissioned a 15 MW/60 MWh battery system at a 34.4 MWp solar plant in Portugal — one of the country’s largest solar-plus-storage hybrids to date, connected straight into the 150 kV transmission grid. Hybridization is no longer the exception in Iberian development — it’s becoming the default design assumption, and Lisbon’s newly…










